Guide
From prototype to series: a BOM checklist
Published · DefChain
Short answer
Before series production, every BOM line needs a manufacturer part number, a known lead time, a plan for single-source parts, a recorded country of origin, and a place in a kit list. The twenty checks below cover part data, supply risk, made-to-drawing parts, compliance and the build itself.
A prototype BOM is built for one engineer who knows every part. A series BOM has to work for buyers, suppliers and the assembly line without that engineer in the room. Tick the checks as you go.
Part data
Supply risk
Parts made to drawing
Compliance
Build
Where most BOMs fall short
Three gaps cause most of the trouble: no second source for long-lead parts, no recorded origin, and no kit list. The first one stops the line; the second one stops the contract; the third one wastes hours on every build.