From prototype to series: a BOM checklist

Published · DefChain

Short answer

Before series production, every BOM line needs a manufacturer part number, a known lead time, a plan for single-source parts, a recorded country of origin, and a place in a kit list. The twenty checks below cover part data, supply risk, made-to-drawing parts, compliance and the build itself.

A prototype BOM is built for one engineer who knows every part. A series BOM has to work for buyers, suppliers and the assembly line without that engineer in the room. Tick the checks as you go.

Progress0 / 20

Part data

Supply risk

Parts made to drawing

Compliance

Build

Where most BOMs fall short

Three gaps cause most of the trouble: no second source for long-lead parts, no recorded origin, and no kit list. The first one stops the line; the second one stops the contract; the third one wastes hours on every build.

Want a second pair of eyes on your BOM?

Send it to us. We reply with lead times, risks and a quote per line.

Send a BOM