Skip to content

EU SAFE

The EU SAFE 65% rule and your bill of materials

Under the EU SAFE instrument (Regulation (EU) 2025/1106), the cost of components originating outside the EU, EEA-EFTA states and Ukraine must not exceed 35% of the estimated cost of the components of the end product. In practice, at least 65% of component cost has to come from inside that area.

Source: EUR-Lex summary of Regulation (EU) 2025/1106

Regulation
(EU) 2025/1106
Instrument
EU loans of up to €150 billion
Origin rule
≥ 65% EU / EEA-EFTA / UA cost
Also required
Contractors established inside

Why it matters to manufacturers

To be part of a SAFE-funded contract, the cost of components originating outside the EU, EEA-EFTA states and Ukraine must not exceed 35% of the estimated cost of the components of the end product. Contractors and subcontractors must also be established there and not controlled from outside. Buyers will ask their suppliers to show where each line comes from.

The European Defence Industry Programme (EDIP, Regulation (EU) 2025/2643) applies a similar 35% limit on components from outside the eligible countries in the actions it funds. The same BOM review supports both.

What we do: SAFE origin review

  1. 01You send a BOM: part numbers, quantities and suppliers. No drawings needed.
  2. 02We verify the real country of origin for every line: where it was made, not where it was bought.
  3. 03We flag lines exposed to Chinese export controls, such as drone items under MOFCOM Announcement No. 49 and rare-earth magnet controls.
  4. 04We calculate the EU / EEA / Ukraine share and show which lines to change to reach 65% at the lowest cost.
  5. 05We quote EU alternatives we can supply, with price and lead time.
Request a SAFE origin review

The first review is free of charge.

Example origin reviewExample
EU / EEA / UA share of component cost
41%Below the 65% share
EU / EEA / UAOther
Controller board · CN · €290Drive motors ×4 · CN · €472Chassis, welded · PL · €580Wiring harness · LT · €240Radio module · TW · €310Battery cells · CN · €12065% minimum
Click a block to zoom in
UGV kit · component cost · €2012 · EU 41%UGV kit · component cost€2012 · EU 41%Chassis · €580 · EU 100%Chassis€580 · EU 100%Drive · €472 · EU 0%Drive€472 · EU 0%Electronics · €600 · EU 0%Electronics€600 · EU 0%Power & wiring · €360 · EU 67%Power & wiring€360 · EU 67%Chassis, welded · PL · €580Chassis, weldedPL · €580Drive motors ×4 · CN · €472Drive motors ×4CN · €472Controller board · CN · €290Controller…CN · €290Radio module · TW · €310Radio moduleTW · €310Wiring harness · LT · €240Wiring h…LT · €240Battery cells · CN · €120Ba…CN · €120

.xlsx

Prefer to check it yourself?

Our Excel template calculates the share as you fill it in, as long as you know the origin of every line. Most teams do not: a distributor's country is not the country of origin. Missing origins or below 65%? Send us the file.

Our review is a working calculation to help you plan sourcing. Compliance itself is assessed by the contracting authority. DefChain is established in Lithuania (EU).

How to calculate the share of your BOM

  1. 01

    List every component and its cost

    Use the estimated cost of each component in the end product, line by line.

  2. 02

    Find the country of origin

    Where each component was made. Not where the supplier or distributor is based.

  3. 03

    Group the origins

    EU member states, EEA-EFTA states (Iceland, Liechtenstein, Norway) and Ukraine count as inside. Everything else counts as outside.

  4. 04

    Divide

    Inside cost divided by total component cost. At least 65% is required; outside components may be at most 35%.

Where BOM origin calculations go wrong

Using the supplier’s country
A component bought from a German distributor can still be made in Asia. Origin is where it was made.
Leaving out small lines
Fasteners, cables and connectors are cheap one by one but add up across a BOM.
Guessing missing origins
Datasheets often omit origin. An unverified guess can move the share by several points.
Forgetting other conditions
SAFE also sets rules on where contractors are established and who controls them. The 65% share is not the only test.

EU SAFE: common questions

Which countries count towards the 65%?

The 27 EU member states, the EEA-EFTA states (Iceland, Liechtenstein and Norway) and Ukraine. Switzerland is in EFTA but not in the EEA, so it does not count.

Is the share based on price or cost?

The regulation refers to the estimated cost of the components of the end product. The Commission may clarify the calculation method, so check the requirements in your contract.

Does SAFE apply to my company?

It applies to procurements funded by SAFE loans. Contracting authorities pass the requirements to their contractors, and contractors pass them to their suppliers.

Is your review a compliance certificate?

No. It is a working calculation to help you plan sourcing. Eligibility is assessed by the contracting authority.

Send us your BOM

The first SAFE origin review is free. We verify origins, calculate the share and quote EU alternatives we can supply.

Request a review